+90 (530) 650 24 77 sonerbayrak@mkskontrol.com.tr
JER-EH

Applications

For extractive gas analysis

For emission and process monitoring

For avoidance of acid dew point lower deviaton between sampling point and gas sampling probe

Combinable with gas sampling probes JES-301 and JES-301L


Benefits

Sampling without influence on the sample gas

No corrosion due to condensate formation

Homogeneous heating of interior and exterior pipe to 180 °C due to even temperature distribution across the whole heat conductor length, independent of the operating conditions

Easy mounting

Pre-filter and extensions adaptable

No temperature sensor necessary with HTI-16

Pt100 temperature sensor with JTC-308

Illuminated temperature display


Features

Corrosion resistant double shell pipe with internal heating

Heating failure monitoring with alarm contact and indication

Mounting directly at the standard process flange

Tube length of 500 to 2000 mm available

Controlled heating up to 180 °C

Electronic temperature controller with temperature display

Controller for wall mounting or directly mounted at the sampling tube (option)

Electrical connection with plug connection STAS200 for temperature controller HTI-16 or turn-key mounted with JTC-308


MKS Control Systems

For more information, please contact us.

SCROLL